Site and capacity survey
bathroom count and available pressure assessed before any unit is chosen

Jahra
Central heater installation in Sulaibiya Industrial focuses on maintenance and safety standards in a demanding operational setting. We select an industrial-grade unit with high output, mount it in a room protected from dust and oil vapour, and create a circulation loop serving heavy hot water loads.
Industrial and assembly sites in Sulaibiya Industrial have high-volume worker wash facilities and degreasing showers before shift end, placing continuous pressure on hot water supply during peak hours. We install a boiler with a robust heat exchanger and a pressurised overhead storage tank of adequate capacity, then mount an electric circulation pump that keeps pipes warm throughout the day. We fit a pressure regulator at system inlet and sediment filters before each high-use point.
Sulaibiya Industrial is in Jahra governorate, a heavy assembly and production zone where hot water demand shifts rapidly with work shifts.
The pressurised tank is tested under simultaneous high temperature and maximum expected load for one hour before system handover.
bathroom count and available pressure assessed before any unit is chosen
tank secured on brackets rated for full operating weight
supply and return lines run at correct fall to prevent stagnation
gas or electrical feed connected with ventilation confirmed before start-up
expansion valve and drain-off valve fitted as standard safety requirements
every joint checked for leaks under pressure before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, industrial water carries more sediment than domestic supply. We install a metal mesh filter before the boiler, then ceramic filters at high-use points to prevent shower heads and valve blockage.
We install a circulation pump with backup at modest extra cost and create an easily accessible test point for rapid fault diagnosis. We provide clear emergency shutdown instructions and contact details for night-shift repairs.
