Fault diagnosis
Element, thermostat and wiring tested before any parts are removed

Mubarak Al-Kabeer
Electric heater repair in Sabhan Industrial focuses on large-capacity heaters used to heat water in factories and warehouses. We inspect high-voltage wiring and multiple elements inside the tank. We test each circuit separately. Production resumes with stable hot water.
Sabhan Industrial warehouses house large electric heaters beside metal processing lines or washdown zones, running on high-voltage three-phase supply. These heaters contain multiple heating elements wired in parallel or series, so if one fails heating drops incrementally rather than stopping completely. We measure voltage across each phase, identify which element is not heating, and replace only that one.
Sabhan Industrial Area is in Mubarak Al-Kabeer governorate, hosting factories and commercial warehouses where industrial heaters are essential infrastructure.
Before any electrical work, we measure actual voltage on each phase to ensure safety and detect any imbalance.
Element, thermostat and wiring tested before any parts are removed
Scaled or burnt element removed and a matched replacement fitted
Thermostat tested and adjusted or replaced if it no longer cuts off correctly
Leak located with camera; tiles are not broken unless the pipe itself is cracked
Calcium sediment drained from the tank base to restore heating capacity
Temperature and pressure confirmed in front of the customer after repair
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, three-phase heaters require a safety disconnect switch and industrial thermostat to monitor temperature and pressure. Without them, safe operation is impossible.
The thermostat should cut power at a set point like 65°C, but if it does not, the thermostat or temperature probe may be faulty or misplaced. We recalibrate it or reposition it.
