Site and capacity check
Capacity matched to actual household size and usage pattern

Capital
Installing a water heater in Jaber Al-Ahmad City requires understanding modern building design and pipes buried beneath floors. We trace the cold water line from the meter and position the heater to avoid excessively long runs. We test every joint before completion.
New Jaber Al-Ahmad City buildings use modern distribution systems where pipe routes are set from the engineering drawing. The heater usually sits in a kitchen cupboard or utility alcove close to the cold inlet. We check the heater base is level, then connect the cold supply straight from the main line and run hot distribution pipe to the outlets.
Jaber Al-Ahmad City is a new residential project in the Capital, where modern construction means fundamental systems are documented and accessible compared to older districts.
We measure heater outlet temperature with a digital thermometer and record the reading during every installation test.
Capacity matched to actual household size and usage pattern
Secure fixing to wall or platform rated for the tank weight
Hot and cold lines connected with heat-rated fittings and isolation valves
Electrical or gas supply connected; ventilation verified for gas units
Pressure relief valve and expansion vessel fitted before pressurising
System filled and checked for leaks before final handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate the cold line length first because long pipe runs affect pressure at the heater inlet. If distance is large we may choose a slightly larger heater or use a mounting position closer to the meter.
We pressure test before connecting the new heater, and if we find a leak we repair it first rather than ignore it. We use new copper fittings at every joint before filling the system.
