Site and capacity check
Capacity matched to actual household size and usage pattern

Capital
Water heater installation in Rawda starts with checking the boiler location, existing pipework and available pressure. We size the heater to your supply and bathroom count, connect hot and cold lines, fill the system and test pressure and temperature before handover.
Most Rawda villas have a utility room or service bathroom near the kitchen, making heater wall-mounting straightforward. We trace the cold supply coming down from the roof tank and follow the run to all endpoints in bathrooms and kitchen. If existing copper pipework is narrow, we recommend replacing a section to ensure the new heater gets enough inlet flow.
Rawda lies in Kuwait Governorate near the Rawda Co-op, a villa district with water heating systems of varying ages.
Before handover, the heater runs to full capacity and hot water temperature is checked at the farthest outlet to confirm performance.
Capacity matched to actual household size and usage pattern
Secure fixing to wall or platform rated for the tank weight
Hot and cold lines connected with heat-rated fittings and isolation valves
Electrical or gas supply connected; ventilation verified for gas units
Pressure relief valve and expansion vessel fitted before pressurising
System filled and checked for leaks before final handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Not always. We check bore and internal corrosion; if in good shape and passing adequate flow, we keep them. Replacing only the section near the heater may suffice if the main run is too narrow.
Usually one hour after installation. We fill slowly to bleed air from the pipes, then run the heater to full capacity and monitor pressure and temperature at each tap.
