Site and capacity check
Capacity matched to actual household size and usage pattern

Farwaniya
Heater installation in Shadadiya requires precise measurement of water pressure in this outer-suburb zone and calculating the long pipe run from the entry point. We choose a heater with enough power to compensate for heat loss and pressure drop, mount it near primary use and test each point separately.
Shadadiya houses in the outer zone are detached or semi-detached villas with large gaps between building and street, meaning your supply pipe is very long. We mount the heater near the main kitchen to cut distance to the most-used point, and we insulate pipes well to prevent heat loss in the hot climate. If pressure is low in this outer area we fit a small pump beside the heater to push water to all taps with equal force.
Shadadiya sits in the outer edges of Farwaniya governorate where houses are spread out and pressure is weaker, which requires careful selection of heater power and insulation.
We measure pressure from the street supply to the house entry using a pressure gauge before choosing heater size or pump.
Capacity matched to actual household size and usage pattern
Secure fixing to wall or platform rated for the tank weight
Hot and cold lines connected with heat-rated fittings and isolation valves
Electrical or gas supply connected; ventilation verified for gas units
Pressure relief valve and expansion vessel fitted before pressurising
System filled and checked for leaks before final handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Because your supply pipe is very long and cold water must leave the line first before hot water emerges. We fit larger diameter pipes to reduce distance, and insulate them to cut heat loss on the run.
We test pressure first, and if it is below 1.5 bar we recommend a small pump. A pump delivers hot water forcefully to all taps at once without temperature drop when you open more than one.
