Pre-work survey
Camera run before any intervention to locate the exact fault point

Jahra
CCTV inspection in Mutlaa tests drain lines running across rocky uneven ground beneath scattered individual homes. We insert the camera from the nearest inspection chamber and measure every centimetre to the line's end. The screen displays debris, shifts and fractures from soil movement. You receive a video report clarifying whether repair or replacement is needed.
Mutlaa is an area on a high rocky ridge where homes are widely spread across irregular plots. Drain lines span long distances across limestone and gravel soil and may experience gradual settling or seasonal slippage. Old clay or concrete pipes fracture easily under pressure and movement. The camera shows us the first break point and whether there are other deviations along the route.
Mutlaa is in Jahra governorate, a rugged hilly area with exposed desert views and distant horizons.
The camera moves very slowly to capture subtle slips and hairline cracks that would be missed at normal speed.
Camera run before any intervention to locate the exact fault point
Second camera pass after clearing confirms the line is clean and open
Camera reveals pipe cracks and joint displacement caused by ground movement or roots
Internal leak points identified before any decision to break and repair
Camera survey of lines entering and leaving inspection chambers and cesspits
Survey of restaurant and commercial lines where grease and deposits build up
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The camera clarifies the number and location of cracks. If damage is local, we apply thermal resin internally to seal the fractures. If damage is widespread, replacement is the better solution.
Settling is gradual and cumulative. The camera documents this year's shifts compared to previous reports. If slippage increases, we discuss foundation bracing or rerouting the line.
