Walls and base coating
Full internal surface treated including the pit base

Mubarak Al-Kabeer
Cesspit leaking in Masayel usually starts from cracks in the pit walls or a weakened base after years of use. We open the pit and scan the walls and floor with an internal camera, then coat the entire inner surface with a waterproof sealant. After treatment we test the seal and record it on video before closing the cover.
Most Masayel houses are medium-sized with older pits under the front garden close to the house walls. This proximity to foundations means any leak can weaken the soil beneath the walls quickly. We first check the water level in the pit and the condition of the concrete collar around the opening, because collar cracks are the most common leak sources in this area.
Masayel sits in Mubarak Al-Kabeer governorate, a residential zone of older housing developments where most cesspits date back several decades.
We test cesspit tightness by filling the pit with clean water and measuring the drop after two hours because fine cracks only show under real pressure.
Full internal surface treated including the pit base
Cracks and voids filled before any coating is applied
Pit emptied and pressure-washed before waterproofing starts
Internal camera documents wall condition before work and after
Collar and pipe-entry points sealed against infiltration separately
Available around the clock across all 6 Kuwait governorates
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Cleaning, camera inspection, sealant application and drying usually take five to seven hours the same day. We test the seal with water before leaving the site.
Damp soil around the pit dries gradually once leaking stops, but may take two to three weeks depending on soil texture. The seal stops new moisture from the pit only.
