Walls and base coating
Full internal surface treated including the pit base

Mubarak Al-Kabeer
Cesspit treatments in Sabhan Industrial focus on stopping leaks from the large pits serving warehouses and factories. We open the pit and inspect it with high-resolution camera to locate cracks in walls and base. We then apply heavy-duty waterproof coating to every inner surface and test tightness with water before replacing the cover.
Sabhan warehouses use oversized pits because daily factory discharge is very high. These large pits face higher pressure than residential pits, and cracks in them leak far more water. Before sealing we check the level of adjacent foundations and whether they sit close to pit walls, because some older warehouses were built very near existing pits.
Sabhan Industrial sits in Mubarak Al-Kabeer governorate and holds hundreds of warehouses and small to medium factories.
We test large industrial pits by filling gradually and measuring drop at each water level metre because leakage increases with pressure.
Full internal surface treated including the pit base
Cracks and voids filled before any coating is applied
Pit emptied and pressure-washed before waterproofing starts
Internal camera documents wall condition before work and after
Collar and pipe-entry points sealed against infiltration separately
Available around the clock across all 6 Kuwait governorates
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes if there is a backup pit or temporary tank available. If it is the only pit then factory discharge must stop for eight to ten hours until the coating dries.
A large pit needs heavier lifting equipment and more labour for descent and ascent, and the sealant takes longer because the interior surface is bigger. The principle is the same but execution takes a full day or more.
