Walls and base coating
Full internal surface treated including the pit base

Ahmadi
Cesspit waterproofing in Shuaiba Industrial starts with inspecting pit walls and base for leaks or decay. We apply sealant layers to walls, base and collar, then run a camera through to verify the seal before the cover closes.
Most industrial facilities in Shuaiba have deep cesspits designed to handle wastewater flow from admin buildings, canteens and laboratories. These pits sit in clay soil near the KIPIC complex and pit walls often crack from moisture and sustained pressure. Before treatment we lift the cover and inspect with a deep camera to pinpoint every leak. Where concrete has eroded we remove the surface layer and apply epoxy sealant to walls and base. We then verify the seal with water before handover.
Shuaiba Industrial lies in Ahmadi governorate, a manufacturing and processing zone where deep cesspits are essential for admin and support buildings.
We test pit tightness by filling it with water for one hour then measuring level drop because any leak shows at once.
Full internal surface treated including the pit base
Cracks and voids filled before any coating is applied
Pit emptied and pressure-washed before waterproofing starts
Internal camera documents wall condition before work and after
Collar and pipe-entry points sealed against infiltration separately
Available around the clock across all 6 Kuwait governorates
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Sealing only walls leaves the pit base and collar around the inlet pipe exposed to seepage. We treat all three with continuous epoxy layers to ensure no leak path remains.
The camera before sealing confirms our work succeeded at that moment, but annual inspection is still needed to monitor the treated walls. We record the video as a baseline record for future comparison.
