Site level survey
Ground elevation readings confirm the natural direction water will travel

Ahmadi
Storm drain design in Shuaiba Industrial starts with reading the site's low fall and proximity to the sea. We plot every collection point on roofs and yards and calculate water flow by area and height. Each drain pipe is water-tested before concrete is poured and construction drawings are handed over complete.
Large industrial buildings here have expansive flat roofs and paved yards hundreds of square metres in size, meaning massive water flow during heavy rain. We divide the roof into separate drain zones and run large-diameter pipes sloping toward the nearest collection point. Near the KIPIC complex, sandy soil saturates quickly, so we raise drain outlets slightly and add side-drain pipes to distribute load across wider ground.
Shuaiba Industrial lies in Ahmadi governorate and hosts major petrochemical facilities, where storm drainage is a critical part of site design.
Every pipe section is tested by pumping at full expected flow volume before trenches are covered.
Ground elevation readings confirm the natural direction water will travel
Expected flow volume determines the correct pipe diameter for each run
Gullies are positioned so no low point is left without an outlet
Chambers placed at every direction change to allow future maintenance
Adequate slope prevents sand settlement and keeps flow gravity-driven
Final discharge point set away from foundations, fencing and neighbouring plots
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We divide the roof into drainage zones and run separate pipes from each zone to a ground collection sump. Pipe diameter is calculated from roof area and expected rainfall intensity to prevent water backup.
It depends on soil type and distance to a municipal line. In Shuaiba, sandy soil saturates fast, so we prefer connecting to the public network if available, otherwise we run drainage to a deep absorption well.