Pre-fit camera check
Line condition and diameter confirmed before valve position is chosen

Mubarak Al-Kabeer
Backflow valve installation in Mesila starts by lifting the existing sewer cover and watching the water level in the line. We run a camera to trace the main drain toward the street and measure the depth difference between drains under the building and under the street. We fit the valve where slope changes and test opening and closing under pressure rise simulation.
Tourist and hotel facilities on Mesila Beach drain multiple kitchens and bathrooms into one limited main line. That single line may pressure spike when several floors flush together, reversing water to lower decks. We measure flow rate from each toilet bank, sinks and kitchen to calculate peak pressure, then select a valve sized correctly. After install we run a long test with sustained hotel discharge for one hour to confirm the valve stays open during normal use.
Mesila lies in Mubarak Al-Kabeer near Green Island and the beach hotel area, a hospitality zone draining into a shared limited sewer network.
We test the valve under full closure at high pressure for thirty seconds to check for leaks from the valve body or seals.
Line condition and diameter confirmed before valve position is chosen
Closest viable point to the public sewer for maximum protection
Valve set into the line without unnecessary tile breaking
Flap mechanism tested in both directions before the line is reconnected
Line filmed again to confirm valve seating and unobstructed flow channel
Correct siting verified relative to cesspit or inspection chamber position
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, the valve is pure mechanical and needs no external power. It runs on natural pressure difference between the two sides with zero electrical connections.
Every three months, especially given high kitchen and bathroom loads. We send our team to inspect the flapper and clear any grease pooled at inlet or outlet.
