Pre-fit camera check
Line condition and diameter confirmed before valve position is chosen

Mubarak Al-Kabeer
Backflow valve installation in Sabhan Industrial begins with a full camera inspection of the factory main sewer. We locate sediment and industrial debris that may reduce flow. We choose an inspection chamber large enough for pumping and maintenance, then fit an oversized valve and test it under full load.
Most factories and warehouses in Sabhan discharge heavy water with sediment and solids. If street blockage occurs, this heavy water backs into the factory floor or treatment basin. A backflow valve stops this reverse flow and protects machinery from moisture and rust. We fit an oversized valve so normal factory discharge flows freely even during heavy production days.
Sabhan Industrial sits within Mubarak Al-Kabeer governorate, a zone dedicated to factories and warehouses where shared mains bear heavy discharge pressure.
The factory valve is tested by running pumps for a full hour to ensure no water returns to internal pipes.
Line condition and diameter confirmed before valve position is chosen
Closest viable point to the public sewer for maximum protection
Valve set into the line without unnecessary tile breaking
Flap mechanism tested in both directions before the line is reconnected
Line filmed again to confirm valve seating and unobstructed flow channel
Correct siting verified relative to cesspit or inspection chamber position
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, if we size the valve correctly it will not reduce flow. We calculate your daily factory capacity first, then fit a valve larger than the main line to ensure no restriction.
This depends on sediment volume in your line. We suggest a camera check every six months to verify debris buildup around the valve. If heavy deposits form we clean the line, not the valve.
