Pre-fit camera check
Line condition and diameter confirmed before valve position is chosen

Capital
Backflow valve installation in Shuwaikh Industrial is done on the main discharge line that collects water from multiple units or warehouses on site. The main line is often large-bore and may hold industrial deposits, so we fit a valve with a quality flapper that resists sticking. We test it under high pressure before full operation.
Warehouses and small factories here discharge water and oils through a shared buried line, and in heavy winter rain contaminated water backs into unit floor levels. The shared line is relatively deep but may narrow at certain points, so we use a camera to find the best valve location where it will not impede normal flow. The key to design is choosing a valve with quick opening that does not cause backup during normal pumping.
Shuwaikh Industrial sits in Kuwait governorate amid factories and storage, where sewage infrastructure lines are shared among multiple tenants.
We measure actual backpressure on each line before selecting the right valve size.
Line condition and diameter confirmed before valve position is chosen
Closest viable point to the public sewer for maximum protection
Valve set into the line without unnecessary tile breaking
Flap mechanism tested in both directions before the line is reconnected
Line filmed again to confirm valve seating and unobstructed flow channel
Correct siting verified relative to cesspit or inspection chamber position
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
A quality valve opens quickly and does not impede normal drainage. However, if the line is already narrow we may need to enlarge it, and we test flow rate before and after installation.
We design easy access above the valve and inspect it every six months with a probe camera. If deposits build up we flush them with water pressure before the flapper clogs.
