Pre-fit camera check
Line condition and diameter confirmed before valve position is chosen

Jahra
Installing a backflow valve in Sulaibiya Industrial starts with a camera survey of the main drain line from the industrial buildings toward the soakage pit. We determine pipe diameter and fall, choose the right valve size, install it and test complete closure.
The Sulaibiya Industrial zone has multiple factories and workshops, each draining water and light oils into a shared line before the soakage pit. In winter or when the pit fills rapidly, water can back up into workshop floors through the drains. A backflow valve is installed at the industrial zone outlet right before the pit and protects all buildings from backflow with a single valve.
Sulaibiya Industrial zone sits in Jahra governorate and uses a unified central drainage system serving all shops and factories.
We test the valve by reverse-pumping water from the inspection port toward the buildings to confirm the valve seals tight.
Line condition and diameter confirmed before valve position is chosen
Closest viable point to the public sewer for maximum protection
Valve set into the line without unnecessary tile breaking
Flap mechanism tested in both directions before the line is reconnected
Line filmed again to confirm valve seating and unobstructed flow channel
Correct siting verified relative to cesspit or inspection chamber position
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the drain line is one central line before the pit. One valve at the outlet protects all connected buildings from a single backflow event.
Light oils do not damage the valve but can increase line clogging. We inspect the line periodically with a camera and recommend a treatment separator if loads are heavy.
