Pre-fit camera check
Line condition and diameter confirmed before valve position is chosen

Jahra
New houses near New Jahra Co-op are the easiest place for drain backflow valve installation, because the yard drains are still exposed before paving and landscaping. Fitting the valve now, with a proper access chamber, avoids breaking finished paving later when a surge shows it was needed.
During construction the drain from the house to the boundary chamber is open in its trench, so the valve can sit at the right point: after the lowest fixtures' branch joins and before the connection to the public sewer. We set it inside a chamber with a cover at finished paving level, so the owner of the new Jahra house can reach it without digging, and note its position on the drainage drawing handed over with the house.
Jahra (New) is a growing residential district in Jahra governorate near Jahra Mall, Jahra Hospital and New Jahra Co-op, with many houses under construction.
A backflow valve fitted before paving can have its access cover set at finished level, avoiding later excavation.
Line condition and diameter confirmed before valve position is chosen
Closest viable point to the public sewer for maximum protection
Valve set into the line without unnecessary tile breaking
Flap mechanism tested in both directions before the line is reconnected
Line filmed again to confirm valve seating and unobstructed flow channel
Correct siting verified relative to cesspit or inspection chamber position
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, with the drain trench open it goes in easily, and its cover can be set to the final paving level.
Yes, it sits under a cover at paving level and its position is marked on the drainage drawing.
