Pre-fit camera check
Line condition and diameter confirmed before valve position is chosen

Ahmadi
Backflow valve installation in Wafra Agricultural starts with a camera survey of the main line before choosing valve position. We locate the fitting point near the farm frontage, install the valve and test closure, opening and full flow.
Wafra Agricultural farms rely on long drain runs extending from sheds and storage areas across low ground to the main collection point. Backflow occurs in winter when trapped water fills the pipes and sewage pressure forces backwards at ground tanks. We install the valve in the line before the tank with clearance for inspection and cleaning, and test it under reverse pressure to prevent any water return.
Wafra Agricultural lies in Ahmadi governorate, an operational zone of farms and poultry facilities set on low sandy ground.
The valve is tested under full reverse pressure with water to confirm complete closure before handover.
Line condition and diameter confirmed before valve position is chosen
Closest viable point to the public sewer for maximum protection
Valve set into the line without unnecessary tile breaking
Flap mechanism tested in both directions before the line is reconnected
Line filmed again to confirm valve seating and unobstructed flow channel
Correct siting verified relative to cesspit or inspection chamber position
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually in late winter when main pipes fill quickly from rain or slow drainage. Trapped water backs up toward the shed and ground tanks.
Yes, every six months check it with a camera to confirm the internal flapper is clear. Clean the inlet of sand and silt that may prevent full closure.
