Blocked outlet clearing
Removing sand and silt blocking storm-water outlet pipes

Ahmadi
Storm-water drainage in Wafra Agricultural starts with mapping how rain flows from barn roofs, storage sheds and house gutters to surrounding ground. We run open or covered lines toward distant soakaway pits away from growing areas. Every fall and joint is tested to ensure rapid clearance before pooling occurs. The work demands knowledge of sandy soil and deeper networks than residential zones need.
Farms in Wafra have plastic greenhouses, animal sheds, wells and varied-height storage buildings, each collecting rainfall differently. Large barn roofs concentrate heavy water volumes at few points, so we size mains larger and add more collection inlets. Sandy soil drains fast but cannot handle sudden pooling, so we dig spaced soakaway pits and run connecting pipes on constant fall that never breaks. Proximity to Wafra Co-op means some land is shared, so we consult before trenching or altering any lines.
Wafra Agricultural in Ahmadi governorate holds hundreds of scattered fields and sheds, an area where fast rainfall drainage is essential to protect crops and livestock.
Each line is tested with rapid water fill to check for leaks and blockages before the rainy season.
Removing sand and silt blocking storm-water outlet pipes
Water jet cuts through compacted sand and dried silt inside the line
Internal filming before and after so the clear result is confirmed
New network laid to correct falls for the property footprint
Emptying and cleaning collection sumps and linked floor gullies
Pre-season visits to keep storm lines clear before rain arrives
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we dig deep under the track and lay a strong pipe with sufficient diameter. The crossing is tested after backfill to confirm no leakage at the opening point.
Usually 1.5 to 2 metres, because water drains fast but we need enough capacity to hold minutes of heavy rain. We use stone and separator gravel to distribute water evenly around the walls.
