Sediment removal
Vacuuming out compacted silt, sand and sludge from the chamber floor.

Mubarak Al-Kabeer
Manhole cleaning in Sabhan Industrial differs from residential work because factories and warehouses discharge larger volumes and industrial sediment. We extract dense sludge, clean the walls and pressure-test the pipes to ensure the network stays unblocked. The system here is sensitive to any flow delay.
Sabhan Industrial contains large factories and warehouses dumping into one network under the main road. Industrial materials, oils, sand and cement settle quickly in inspection chambers. We remove thick sediment layers with a powerful suction truck, then wash walls with very high-pressure water and inspect pipes with a small camera to spot cracks or unnatural bends.
Sabhan Industrial sits in Mubarak Al-Kabeer governorate, a dense industrial zone where the main network bears continuous industrial load.
We probe each chamber inlet pipe with a rigid clearing rod because heavy materials cause bends that are not visible from outside.
Vacuuming out compacted silt, sand and sludge from the chamber floor.
High-pressure hoses strip grease and scale deposits from the chamber walls.
Camera films the chamber and connecting lines before and after cleaning.
Clearing flow channels inside the chamber so water moves without pooling.
Fitting or replacing damaged and missing manhole covers on site.
Noting cracks or erosion in the chamber walls and recommending repair.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
At least every six months in Sabhan because volume and velocity are higher. We recommend a maintenance contract to prevent sudden blockages that halt factory operations.
We stop immediately and remove nothing. We ask you to identify the substance and its source before continuing. We may need to call a hazardous waste specialist or safety team from the relevant authority.
