Sewer network installation
Laying internal and external sewer pipes with correct fall and alignment

Mubarak Al-Kabeer
The sewer network in Funaitees covers a mix of villas and apartment blocks in a rapidly expanding area. We run pipes from beneath each building to a local collection line running under secondary streets. This local line then connects to the municipal main network at one approved point.
Funaitees is growing rapidly with diverse modern buildings of varying height and use, making network design complex since each building has different elevation and distance from the collection line. We draw a central line under the main street with steady fall, then branch smaller lines from this spine to each building. Tall buildings need steep drop branches, and low buildings need small lift stations.
Funaitees sits in Mubarak Al-Kabeer governorate, a modern urban area housing villas and multi-storey residential blocks.
Each branch line is tested under three bar pressure before connecting to the final network.
Laying internal and external sewer pipes with correct fall and alignment
Tying the building network into the public sewer at the designated manhole
Camera survey confirms no offset joints, sags or debris before backfilling
Constructing or placing inspection chambers at correct intervals along the network
Testing joint integrity to confirm no leaks before the trench is covered
Drainage works for villas, commercial buildings, and residential complexes
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Tall buildings drain directly via a steep branch dropping quickly to the central line. Low buildings need a small integrated lift station in the basement or underground. Each case is designed to the building's exact elevation.
We divide the street into short phases, each closed for only two to three days for excavation and installation. Alternative routes handle pedestrian and cycle traffic during work. Each phase reopens immediately after completion.
