Sewer network installation
Laying internal and external sewer pipes with correct fall and alignment

Ahmadi
Sewer networks in Mina Abdullah connect administrative buildings, pump stations and various tanks through reliable main lines. We survey the entire port including piers and warehouses to set optimal routes avoiding conflicts with other services. Pipes are laid underground at proper depth and each section is tested before connecting to the municipal wastewater treatment plant.
The port contains administrative buildings, control rooms and worker shelters, each with different drainage levels by location. Buildings near sea level may face rising groundwater at certain times, so we elevate main lines or install one-way check valves to prevent backflow. Piers and roads are often crowded with other pipelines, so we plot alternative routes beneath walkways or along road edges.
Mina Abdullah lies in Ahmadi governorate on a coastal bay and is a hub for loading and unloading crude oil and general cargo.
Before handover, each separate section is pressure-tested and joint seals are checked under water pressure.
Laying internal and external sewer pipes with correct fall and alignment
Tying the building network into the public sewer at the designated manhole
Camera survey confirms no offset joints, sags or debris before backfilling
Constructing or placing inspection chambers at correct intervals along the network
Testing joint integrity to confirm no leaks before the trench is covered
Drainage works for villas, commercial buildings, and residential complexes
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install one-way check valves at collection points and main chambers to allow flow in one direction only. We also raise main line levels according to the highest known groundwater level at the port.
We divide work into stages coordinated with port management and use separate routes for equipment and materials. Testing is done at night when traffic is low, ensuring daily operations continue.
