Municipal tie-in
connecting the property drain to the public sewer at the correct entry point

Hawalli
Municipal sewer connection in Anjafa begins with locating the public network access under the street in this residential area. We run your drain pipe with constant slope to the network entry, test by camera and leave you with documented video proof of connection.
Anjafa houses are a mix of individual villas and residential apartment blocks, the district is moderately developed with regular streets and relatively modern utilities. The soil here is stable clay, and the public network runs at consistent depth under main streets. We dig a test pit to measure network depth and confirm slope, then select appropriate pipe diameter and plan the route from your property. Camera inspection after backfill confirms the joint is sound and crack-free.
Anjafa is located in Hawalli governorate, a mixed residential district combining villas and apartment buildings.
We test the line by pumping water through and filming it internally because every connection must remain tight for life.
connecting the property drain to the public sewer at the correct entry point
setting pipe fall so flow is self-cleaning and solids do not settle
installing a chamber at the junction point for future access and cleaning
internal filming of the joined line before backfill, customer views the screen
confirming all joints hold before the excavation is permanently closed
connecting new construction or building extensions to the existing public main
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, stable clay soil allows clean digging with strong walls that do not collapse. This means we dig more safely and seal joints better because the pipe is firmly supported.
It depends on line length and depth, but most connections finish in one or two days. We complete digging, laying, backfill, camera inspection and video handover before we leave.
