Municipal tie-in
connecting the property drain to the public sewer at the correct entry point

Hawalli
Municipal sewer connection in South Surra handles dense residential blocks where main lines lie close to primary streets. We excavate carefully to avoid other pipes underground and connect your line to an approved entry point. Live video documents the working connection before closure.
South Surra residential blocks are built at high density, so electricity, water, telecom and sewer lines all run beneath streets together. Before excavating we request diagrams from relevant authorities showing every line so we do not cut any. The main drain normally sits at steady depth near South Surra Co-op, making connection straightforward without excessive digging.
South Surra lies in Hawalli governorate, a newer residential area with regular streets and multi-storey flats.
We use a metal and cable detector before every excavation to avoid cutting neighbouring electricity or water pipes.
connecting the property drain to the public sewer at the correct entry point
setting pipe fall so flow is self-cleaning and solids do not settle
installing a chamber at the junction point for future access and cleaning
internal filming of the joined line before backfill, customer views the screen
confirming all joints hold before the excavation is permanently closed
connecting new construction or building extensions to the existing public main
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We request the official diagram from Hawalli Municipality, water company and electricity company before starting. Then we trace each line with a safe detector while digging, using hand tools near sensitive spots instead of mechanical diggers.
We work limited hours and use barriers and lights to manage traffic around the site. Most excavation finishes in a day or two, and we coordinate with municipal management to minimize impact on residents and vehicles.
