Municipal tie-in
connecting the property drain to the public sewer at the correct entry point

Hawalli
Municipal sewer connection in Ministries Area begins by locating the public sewer entry point near the site. We run waste pipes from inside the building on a steady fall to the connection point, then test full flow before recording.
Government ministry and office buildings in the area are usually multi-storey with complex internal drainage systems, and municipal connection requires that the main waste line falls steadily toward the public entry point. We trace the route under floors or above the roof depending on building design, and confirm that all branch pipes meet in a single trunk before connection. If the public chamber sits deeper than average floor level we install a pump station to ensure continuous drainage.
Ministries Area lies in Hawalli governorate, the district that houses the main government ministry complex and public administrative buildings.
We film the entire waste line from the building to the public entry point and record live water flow at the final junction.
connecting the property drain to the public sewer at the correct entry point
setting pipe fall so flow is self-cleaning and solids do not settle
installing a chamber at the junction point for future access and cleaning
internal filming of the joined line before backfill, customer views the screen
confirming all joints hold before the excavation is permanently closed
connecting new construction or building extensions to the existing public main
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use a water level to measure the drop every ten metres along the line. The minimum fall is one millimetre per metre, and if natural gradient cannot be achieved we install a pump station.
We first extract utility locations from building records and plan the route to avoid them. If crossing is unavoidable we route the line above the roof or pass it through a separate protective duct with safe clearance.
