Network route planning
Drain routes mapped against the site plan and building layout

Hawalli
Sewer network installation in Ministries Area begins by surveying the government buildings and access paths. We run PVC or concrete pipes from each fixture outlet underground with a steady fall toward the boundary chamber. Each section is water-tested before burial and every joint location is recorded.
Government buildings in Ministries Area sit far apart with multi-storey toilets and inspection chambers in courtyards between blocks. We trace drainage routes under paved paths to avoid breaking main roads, and ensure pipe depth stays below fresh water lines. We measure from the last fixture outlet to the boundary chamber and choose pipe diameter according to how many branches it serves.
Ministries Area sits in Hawalli, where government and administrative buildings cluster on deep foundations with complex underlying services.
Before handover, each network section is filled with water and monitored for an hour to check for slow seepage at joints.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We map the routes under walkways and verges before starting and use hand digging near paved surfaces. If we must cross a road we cut a narrow strip and resurface it immediately.
We raise the water lines slightly or reduce the drain gradient gradually through extra inspection chambers to achieve the safe gap. We verify the spacing between pipes before burial.