Municipal tie-in
connecting the property drain to the public sewer at the correct entry point

Capital
Streets around the NBK Head Office and Sharq Marina carry heavy traffic through the working day, so municipal sewer connection in Sharq is planned around the road. Where the trench crosses a carriageway, we work at night behind signed diversions and aim to reopen the lane before the morning rush.
A trench across a busy road cannot stay open during business hours without causing long queues. For towers between Kuwait Towers and Sharq Marina, we break the road crossing into night stages, set out cones, signs and lighting to the agreed layout, and cover any unfinished section with steel road plates before traffic returns. The building side of the connection is completed separately by day, away from the carriageway.
Sharq is the capital's waterfront business district, running from Kuwait Towers past Sharq Marina to the NBK Head Office.
Steel road plates cover unfinished trench sections so traffic can pass safely between night work stages.
connecting the property drain to the public sewer at the correct entry point
setting pipe fall so flow is self-cleaning and solids do not settle
installing a chamber at the junction point for future access and cleaning
internal filming of the joined line before backfill, customer views the screen
confirming all joints hold before the excavation is permanently closed
connecting new construction or building extensions to the existing public main
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Only one lane at a time and usually at night. Diversion signs and lighting are in place while the trench is open.
Yes. Work inside the plot boundary is done by day, and only the road crossing is kept to night hours.