Municipal tie-in
connecting the property drain to the public sewer at the correct entry point

Jahra
A municipal sewer connection in Sulaibiya Industrial ties factory and workshop floor drains to the public network through large-diameter heavy pipes. We trench under concrete foundations, route pipes with precise fall, and confirm the connection on video under live water pressure before closing the trench.
Sulaibiya Industrial Zone contains factories and workshops with deep concrete foundations and various floor finishes. Industrial floor draps sit low and are more numerous than residential buildings, often with sand filters or settling screens. We locate all floor waste points in the building before digging and consolidate them into one or more main lines based on expected flow. Trenches under foundations require metal shoring and continuous monitoring while open.
Sulaibiya Industrial sits in Jahra governorate, a light manufacturing and workshop zone where the municipal network is sized for high discharge capacity.
The complete line is tested under continuous water from all interior drain points simultaneously to simulate peak flow conditions.
connecting the property drain to the public sewer at the correct entry point
setting pipe fall so flow is self-cleaning and solids do not settle
installing a chamber at the junction point for future access and cleaning
internal filming of the joined line before backfill, customer views the screen
confirming all joints hold before the excavation is permanently closed
connecting new construction or building extensions to the existing public main
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We bore under the foundation using directional drilling equipment or conventional trenching with steel shoring. The pipe slides through this sleeve and remains protected from foundation shift by sand beds on both sides.
We collect all drains into a common internal line then route this main line to the municipal network. The collector line needs adequate fall and larger diameter to accommodate flow from all points combined.