Network route planning
Drain routes mapped against the site plan and building layout

Hawalli
Salmiya apartment owners along Gulf Road often want to move a bathroom or kitchen during renovation, and sewer network installation in a tower flat has to work within the screed, because the slab below belongs to the neighbour's ceiling. Near Marina Mall, we plan every new route inside the floor build-up.
Screed depth in Salmiya flats is limited, so a relocated toilet can only travel so far before its branch runs out of fall. We measure the screed, calculate how far each fixture can move from the existing stack, and where a longer run is needed, raise the new bathroom floor with a step or platform. Branches are laid in the screed with fall checked every metre, and a test is held before the new floor tiles cover them.
Salmiya is the Hawalli governorate high-rise district along Gulf Road, around Marina Mall and Sultan Centre Salmiya, with many renovated flats.
When a Salmiya bathroom moves, we calculate its maximum distance from the stack from the measured screed depth.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on your screed depth and the distance to the stack. We measure both and tell you the limit before design starts.
The new bathroom floor can be raised with a step or platform to gain the fall the longer branch needs.
