Network route planning
Drain routes mapped against the site plan and building layout

Hawalli
Villas adding a basement in Mubarak Al-Abdullah often find the new rooms sit below the street sewer, and sewer network installation there has to include a pumped section. We design a sealed pumping chamber that collects the basement drains and lifts them into the gravity network at a safe point.
In a Mubarak Al-Abdullah basement, only the fixtures below street level go to the pump, while everything above keeps draining by gravity, which keeps the pump's workload small. The rising main leaves the chamber with a non-return valve and gate valve, loops above the highest drain level before joining, and discharges into a chamber rather than straight into a pipe. We also size the chamber for some storage, so a short power cut does not flood the basement.
Mubarak Al-Abdullah is a Hawalli governorate suburb of detached villas, several now adding basements below street sewer level.
Pumped basement drains in Mubarak Al-Abdullah rise above the highest drain level before joining the gravity network.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Only if they sit above the street sewer. Below that level, a pumping chamber is needed to lift the waste.
The chamber holds a reserve of storage, so normal use can continue for a short time until power returns.
