Network route planning
Drain routes mapped against the site plan and building layout

Ahmadi
A sewer network in Shuaiba serves both industrial and residential zones, so it needs large-diameter pipes and high-pressure-resistant designs. We calculate expected flow, lay the network at precise gradient, run full load tests before operation.
Shuaiba is an industrial and residential zone on the coast south of Ahmadi, where soil is damp and close to saline water. We choose corrosion and salt-resistant pipe material and dig very deep trenches to avoid high groundwater. We install multiple sizes: 200mm from residential buildings and 300 to 400mm in main lines collecting from multiple blocks. Each branch connects to a strong inspection chamber for future maintenance access.
Shuaiba is an industrial and residential district in Ahmadi governorate near the port and seafront.
We test the network at high water flow to simulate peak usage before handing over to the client.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Because the area collects drainage from residential buildings, industrial workshops and port facilities together, so total flow is much higher. 200mm pipes may not suffice, so we use 300 or 400mm depending on the contribution from each zone.
We use strong PVC or salt-treated fibre-cement pipes. If ground is very close to brackish water we may apply an isolating bed of sand and cement around the pipes.
