Network route planning
Drain routes mapped against the site plan and building layout

Capital
Sewer network design in Yarmouk starts by mapping every drain point, bathroom and kitchen on an accurate house plan. We calculate the correct gradient from the lowest floor to the boundary chamber and choose pipe diameter based on fixture count. Every section is pump-tested and observed before burial.
Yarmouk houses near the Yarmouk Sports Club are often modern villas with multiple bathrooms and split-level floors. Waste from upper floors descends through vertical stacks inside walls and meets in a collection chamber at the lowest floor before heading toward the boundary. We test each vertical stack by running hot and cold water together to ensure no blockage or grease deposit.
Yarmouk lies in Kuwait governorate near Yarmouk Co-op and the Yarmouk Sports Club, a district of modern upscale homes.
We check each pipe with smoke to detect any hairline cracks that water pressure alone might miss.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually one at the lowest floor where all vertical stacks meet. If that floor sits above boundary level we fit an intermediate chamber with a pump to lift the waste.
Yes, as far as possible, because any horizontal deflection slows flow and increases blockage risk. We use a plumb and level during installation and fit 45-degree bends at every direction change.
