Blocked outlet clearing
Removing sand and silt blocking storm-water outlet pipes

Ahmadi
Storm-water drainage in Fintas starts by understanding the area is low-lying and coastal, so rain pools quickly in winter months. We run collection lines from roofs and yards toward an inspection chamber and then direct flow to a soakaway or neighbouring land. We calculate fall and pipe diameter by the catchment area and ensure every joint is clear of sediment before final testing.
Many Fintas homes have flat roofs or wide yards, which means collection lines are relatively short but must handle large water volumes in a short time. We fit one or two inspection chambers depending on the run length and test each chamber to ensure water drops without delay. If neighbouring land is close we direct drainage there, otherwise we install an underground soakaway tank that releases slowly into the soil.
Fintas is in Ahmadi governorate near Fintas Co-op, a coastal area where groundwater sits high.
Every collection line is tested under full water pressure before handover because sediment blocks pipes during the dry season.
Removing sand and silt blocking storm-water outlet pipes
Water jet cuts through compacted sand and dried silt inside the line
Internal filming before and after so the clear result is confirmed
New network laid to correct falls for the property footprint
Emptying and cleaning collection sumps and linked floor gullies
Pre-season visits to keep storm lines clear before rain arrives
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes if the chamber is close to both sources and the pipe diameter is sufficient. We calculate water volume from each roof and choose a diameter that takes the peak without pooling. We test it by filling from both sources at once to confirm.
We install an underground soakaway tank at a depth that keeps it below foundation level. The tank lets water settle then seep slowly into soil, and if soil is impermeable we add a manual or electric pump for emptying.
