Blocked outlet clearing
Removing sand and silt blocking storm-water outlet pipes

Farwaniya
Storm-water drainage in Hassawi starts by checking existing lines for sand and silt buildup that slows flow. We clear debris, test the fall toward the main pit and add secondary distribution pipes where sections dip too low. We verify water moves at proper velocity before leaving the site. This keeps rainwater from pooling against your foundations.
Hassawi houses are older and the land slopes slightly, but original lines are often shallow with uneven fall. We dig a test pit near the garden or side yard to check the current pit depth and condition. If it is very old we propose a new drainage pit at greater depth with new PVC pipe at a steady fall of at least 2 percent slope. Proper flow protects walls from moisture and fine sand in heavy rain season.
Hassawi lies in Farwaniya governorate with spaced family homes and broad yards where rain collects quickly.
We run water through each line before closing the pit because sand fills shallow pipes fast in this area.
Removing sand and silt blocking storm-water outlet pipes
Water jet cuts through compacted sand and dried silt inside the line
Internal filming before and after so the clear result is confirmed
New network laid to correct falls for the property footprint
Emptying and cleaning collection sumps and linked floor gullies
Pre-season visits to keep storm lines clear before rain arrives
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The low corner either has no drainage line or the existing pipe is blocked with fine sand. We dig a new distribution line from that corner to the main pit with steady fall that stops pooling.
Yes if you have a pit at reasonable depth and accept a gentle yard slope toward it. We dig a trench at least 60 centimeters deep and lay pipe gently with fall checked every metre. This protects the pipe from impact and allows slow but steady water movement.