Site level survey
Ground elevation readings confirm the natural direction water will travel

Jahra
Storm-drain network design in Jahra (New) has to consider water that does not start on your plot, since new houses near New Jahra Co-op often sit beside empty land that sends sand-laden runoff their way. We set finished levels and perimeter drains to keep it out.
While neighbouring plots in the newer blocks around Jahra Mall stay undeveloped, rain runs off their bare, compacted ground and carries sand toward the nearest lower point, which may be your gate or yard. We survey the levels of the surrounding land, raise finished floor and threshold levels where needed, and design a perimeter channel or low kerb along the exposed boundary. That water is led to its own silt trap before joining the site drain, protecting the house pipes from sand.
Jahra (New), near Jahra Mall, Jahra Hospital and New Jahra Co-op in Jahra governorate, has new houses beside undeveloped plots.
Surrounding land levels are surveyed so finished floor and threshold heights sit above incoming runoff.
Ground elevation readings confirm the natural direction water will travel
Expected flow volume determines the correct pipe diameter for each run
Gullies are positioned so no low point is left without an outlet
Chambers placed at every direction change to allow future maintenance
Adequate slope prevents sand settlement and keeps flow gravity-driven
Final discharge point set away from foundations, fencing and neighbouring plots
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if it sits higher. A perimeter channel or kerb along that boundary diverts it.
While the house is still being built, raising thresholds slightly above the surrounding ground is a simple way to keep runoff out.