Site level survey
Ground elevation readings confirm the natural direction water will travel

Capital
Storm drain design in Khalidiya begins with comprehensive survey from near Khalidiya Co-op and Khalidiya Park to site boundaries. We map every drain and collector pipe and calculate required fall for each section. Drawings give you plan view and vertical sections with precise elevation numbers.
The area around Khalidiya Co-op and Park experiences natural water flow toward the south street, and most house grounds sit slightly elevated above surrounding roads. We exploit this natural slope and run drain pipes along south boundaries. Floor drains go near low corners and steeply pitched roofs.
Khalidiya lies in Kuwait governorate near Khalidiya Co-op and Khalidiya Park, a high-standard residential area.
Each design is tested with hydraulic models simulating water flow during standard one-hour rainfall before issuing final drawings.
Ground elevation readings confirm the natural direction water will travel
Expected flow volume determines the correct pipe diameter for each run
Gullies are positioned so no low point is left without an outlet
Chambers placed at every direction change to allow future maintenance
Adequate slope prevents sand settlement and keeps flow gravity-driven
Final discharge point set away from foundations, fencing and neighbouring plots
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, design specifies burial depth and compression protection. Pipes sit in a sand bed and are covered with protection layer before retiling or backfilling. Drawings show every burial cross-section.
Older houses often had no separate storm design, so we need complete separation. Modern houses may have deeper foundations and existing pipes, which we reuse and update to current standards.
