العربية Call now

Farwaniya

Storm-drain network design in Rai Industrial

Storm-drain design in Rai Industrial is completely different from residential: massive buildings, vast roofs and paved concrete areas. We calculate flow for the worst-case storm and design huge pipes with multiple detention tanks. Drawings cover every square metre of land.

  • 24-hour emergency
  • Camera first, every job
  • Leak detection without breaking
  • All six governorates

What sets this area apart

Warehouses and factories in Rai Industrial have large roofs and expansive paved yards, mostly asphalt. When rain falls, huge water volumes flow within minutes and the municipal sewer alone cannot handle it. We design large underground storage tanks that hold water temporarily then release it gradually after rain stops. We position tanks to avoid conflict with existing foundations and utilities.

Rai Industrial sits adjacent to The Avenues Mall in Farwaniya governorate, where large warehouses and factories cluster together.

Tank volume is calculated from roof and paved area, plus one-hour worst-case rainfall intensity for the zone.

What the design covers

Site level survey

Ground elevation readings confirm the natural direction water will travel

Pipe sizing

Expected flow volume determines the correct pipe diameter for each run

Gully placement

Gullies are positioned so no low point is left without an outlet

Inspection chambers

Chambers placed at every direction change to allow future maintenance

Line gradient design

Adequate slope prevents sand settlement and keeps flow gravity-driven

Outfall point

Final discharge point set away from foundations, fencing and neighbouring plots

How we work

Our four steps, and you see every one

Illustration of a phone with a speech bubble showing a drain grate
01

You call and describe it

Tell us what is happening and where, and the right equipment is loaded before we arrive.

Illustration of a drain camera reel and monitor at a floor drain
02

The camera goes down

We film the line from inside and know the kind of blockage and its exact place. No guessing.

Illustration of a jetting nozzle spraying into a drain opening
03

We clear it

High pressure water, a machine or a drain snake, whichever the line actually needs.

Illustration of a monitor on a tripod showing a clear line with a tick
04

We film it again

The camera runs a second pass and you see the line clear with your own eyes before we leave.

Who we work for

Same method, same equipment. Only the size of the job changes.

A clean modern bathroom with grey stone tiling

Homes and apartments

  • Drain and gully unclogging
  • Cesspit suction
  • Leak detection without breaking
  • Tank cleaning and waterproofing
A modern office washroom with wall hung basins

Offices

  • Plumbing maintenance contracts
  • Mixer and valve repair
  • Low water pressure
  • Clearing bathroom lines
A stainless steel commercial kitchen with a floor channel drain

Restaurants

  • Grease traps
  • Commercial kitchen lines
  • Restaurant gas lines
  • Scheduled clearing and cleaning
A basement plant room with pumps and neat pipework

Complexes and buildings

  • Sewer network maintenance
  • Sewage and basement sump pumps
  • Manhole and inspection chamber cleaning
  • Operation and maintenance contracts

Why us

Why Al Amana

Amana means trust. Someone else's home is not ours to be careless in.

  • Filmed before and after

    Do not take our word for it. Look at the line yourself.

  • Clearing before breaking

    Breaking is the last resort, never the first step.

  • 24-hour emergency

    A blocked line does not wait for the morning.

  • All of Kuwait

    Six governorates, 139 areas.

  • Maintenance contracts

    For buildings and complexes, servicing before the problem starts.

  • We work on commercial sites too

    Restaurants, offices and complexes, not only homes.

More areas for Storm-drain network design

Back to Storm-drain network design

Other services in Rai Industrial

Common questions

Questions about Storm-drain network design in Rai Industrial

Need someone now? The emergency line is open any hour.
+965 9668 4964

How do we size the detention tank for a large warehouse?

We measure roof and yard area and multiply by Farwaniya's one-hour rainfall coefficient, approximately 40 mm. The result is water volume that will reach the tank in worst case, and the tank must hold all of it.

Does the detention tank add pressure to soil and footings?

Yes, so we position it at least 1.25 metres from existing footings. We design the tank with reinforced walls and base slab and recommend soil testing before construction to determine foundation thickness needed.

A quiet Kuwaiti residential street with a drain cover in the pavement

Need this now?

Tell us what is happening, and the right equipment is on the van before we set off.

Call now WhatsApp