Pipe routing
Mapping every copper run before walls are plastered over

Capital
Central gas network in Gharnata is installed from the external meter to cooking and heating appliances before interior walls and finishes start. We plan the route with minimal threaded joints and test pressure with a certified hand gauge.
Gharnata houses may have simpler construction, so we select standard approved tubing and run it through metal protective ducts where it crosses unstable voids. Where no nearby external wall exists, we route pipes carefully within load-bearing walls and terminate them in sealed metal stop boxes. Pressure testing must be witnessed by the homeowner before handover.
Gharnata in Kuwait governorate is a residential area in the outer suburbs where urban development is accelerating and infrastructure is evolving.
We leave a sealed test report with a photo of the final pressure reading as documentation that the network is sound before any appliance connects.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If pipes are over 15 years old or show deep rust marks, replacement is best for safety. We inspect the house first by photographing the network and provide a detailed report before any work.
Most small houses need two to three work days for pipe runs and full testing, depending on the number of outlet points. We coordinate the route with the contractor one full day before starting.