Pipe routing
Mapping every copper run before walls are plastered over

Capital
Central gas network installation in Dasma begins with measuring distances from the meter to each cooking and heating point. We run copper or steel pipes from the meter, connect branch lines and test pressure before walls close.
Old Dasma houses often need complete network replacement because original pipes are thin or fixed to walls in ways that block maintenance. We size pipes uniformly from the street meter to the last burner in the kitchen, with reducing couplings at each main branch. We leave simple access points at every junction for later inspection of fittings.
Dasma sits in Kuwait governorate near the commercial centre, an older residential area where repeated construction renovations require utilities networks to be updated.
Before walls close, we pressurize the network with compressed air and check every joint with soapy water for leaks.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we run a new branch from the main line to the new spot. We test that branch under pressure, then cap off the old branch at its junction point with a rated metal plug.
It depends on the building stage. Before finishing we run them visibly under the ceiling or inside walls. After finishing we place them in metal conduit on the wall or in narrow approved chases.