Pipe routing
Mapping every copper run before walls are plastered over

Hawalli
When a villa in the Mubarak Al-Abdullah suburb adds a new kitchen or extension, central gas first-fix there means tying a new branch into an existing network. We first check that the main line can carry the extra demand, then connect with a new valve and test the whole network together.
Tying a new branch into an old line means shutting the gas off to the house briefly, so we build and test the new branch in isolation before connecting it. In Mubarak Al-Abdullah villas we measure the main line and compare it with the old and new appliances combined, and if it is too small we suggest a separate line from the source rather than overloading the existing one.
Mubarak Al-Abdullah, also called West Mishref, is a Hawalli suburb where many villas are being extended with annexes and new kitchens.
The new branch is tested in isolation before tie-in, so the house loses gas only briefly.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Only during the short tie-in at the end. The new branch is run and tested while the old kitchen keeps working.
We add up the demand of every old and new appliance and compare it with the line's size and length. If it is not enough, we recommend a separate line.