Pipe routing
Mapping every copper run before walls are plastered over

Hawalli
Central gas network installation in Salwa begins at the main meter and runs to every appliance point in your apartment or villa. We lay copper pipes through walls and under floors before plastering starts. Each branch is tested using air pressure and soap solution to catch any leaks. Handover happens only after every joint and outlet passes inspection.
Salwa villas are typically two or three storeys with the kitchen on the ground floor and bathrooms spread across different levels, meaning the gas network needs long vertical runs through load-bearing columns. We maintain safe clearance from electrical wires and water pipes and document all routes before walls close. Near Salwa Co-op, where newer villas are common, we work around existing side clearances and thermal insulation already in place in the walls.
Salwa lies in Hawalli governorate, a residential villa district marked by modern construction and vertical expansion.
Before walls close, all branches run under test pressure for no fewer than three continuous hours to detect any pressure drop.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, pipes must be separated by at least 15 centimetres when running parallel to prevent heat transfer. Where space is tight, we propose a slight reroute of one line instead.
Only after we hand over the final certificate confirming all pressure and leak tests passed. We advise good ventilation during first use and watching for any odd gas smell.