Pipe routing
Mapping every copper run before walls are plastered over

Ahmadi
Central gas network installation in Shuaiba Industrial starts from the main inlet meter and extends through all sections and warehouses. We run copper branches from the meter point and pressure-test every line with air before walls are plastered.
Shuaiba Industrial warehouses are built on distributed underground runs, and gas pipes must follow the flat horizontal falls specified in industrial standards. We connect each outlet at work points, kitchens and heating stations, leaving adequate pipe length before every socket for later appliance hookup. Dye-water testing catches leaks at all joints before plastering and final finishing.
Shuaiba Industrial sits in Ahmadi governorate, a heavy manufacturing and storage zone near the KIPIC petrochemical complex.
Every gas branch is tested at 1.5 bar for five minutes to confirm no pressure drop before walls are sealed.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We lay copper pipes before concrete is poured, inside protective plastic or metal sleeves with wall markers for future tracing. The pipe is left with enough slack to move with natural foundation settlement.
Yes, but each branch must have a pipe diameter suited to the expected load and pressure. We calculate quantity and spacing and test full flow together before final construction.
