Pipe routing
Mapping every copper run before walls are plastered over

Capital
Central gas installation in Shuwaikh starts from the main meter at the building entrance and runs to every outlet point. We lay copper or galvanised steel branches under floors and walls before plastering begins. Each run is pressure-tested with compressed air to find any leak before walls close. The building is ready for final connection when construction finishes.
Shuwaikh buildings mix large warehouses with shops and offices across multiple floors. Most need just a few gas points in kitchens on the first or second storeys near Shuwaikh Co-op. Pipes run under raised floors or through internal walls at a steady fall toward the outlet. We check every welded or bent joint for strength and fit. Pressure testing happens before any cooking or heating appliance arrives.
Shuwaikh lies in Kuwait City near Shuwaikh Port where commercial and light industrial activity is heavy.
Before handover each branch is held at 10 bar for ten minutes to confirm no pressure drop occurs from any source.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, each unit gets its own branch from the main meter at the building entrance. We divide the meter with separate isolating valves and run each pipe in the cavity between inner and outer walls or under the raised floor.
Dry air pressure testing at steady pressure is the safe method before plastering starts. Water testing is used only after all appliances and driers are fitted and the pipes are confirmed clear of debris.