Pipe routing
Mapping every copper run before walls are plastered over

Jahra
Gas network built right before the walls close in South Jahra starts at the meter point outside. We run copper pipe to each living room, kitchen and heater and pressure-test every branch before plaster goes on.
South Jahra residential buildings are modern multi-storey structures with large kitchens and heaters in living rooms. We plan pipe runs horizontally under floor screed or vertically in unwalled studs, allowing gas outlet points to sit exactly where each appliance needs them. Before any finishing, the network is filled with nitrogen and every joint checked for leaks using soap solution.
South Jahra lies in Jahra governorate, a modern residential district of many apartment blocks requiring central gas networks before final finishing.
Network pressure is tested at 1.5 bar for ten minutes because that pressure reveals tiny leaks at threaded joints.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We take a plan from the builder showing each appliance location, then mark pipe routes on the walls before cutting. All valves and outlets are fixed to the approved plan and signed off before finishing.
No, because after pressure testing and engineering sign-off, moving any pipe or joint requires a full re-test. Any change means a new run and a fresh pressure certificate before finishing can proceed.