Central gas first-fix
Main gas network laid and pressure-tested before walls are plastered.

Ahmadi
Gas network installation in Dhaher starts from the main distribution line connection point and extends across desert to detached villas and commercial buildings. We lay pipes accounting for high temperatures and thermal expansion of metals. The entire network is tested under uniform pressure before handover.
Dhaher villas sit isolated on large plots between sand dunes, and distances between them require long lines from a single entry point. We focus on calculating the horizontal pipe grade because sand shifts and settles over time. Each villa needs a separate pressure regulator beside the external wall to balance pressure before gas enters the building.
Dhaher is in Ahmadi governorate near the Saudi border and is a region of spread desert villas requiring extended gas networks.
Every copper joint is tested with soap solution at 15 bar pressure because desert heat increases leak risk.
Main gas network laid and pressure-tested before walls are plastered.
Residential kitchen gas points run to correct sizing and outlet count.
Commercial kitchen gas networks sized for high demand with isolation at each appliance.
Leak located with detection instruments before any wall or floor is opened.
Ball valves fitted at the main inlet and at every branch point.
Periodic check of all valves, joints and fittings across the gas network.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, desert heat expands copper, so we leave small gaps at joints for free movement. We use flexible clips instead of rigid ones to prevent joint cracking during expansion.
Because the long line from the entry point loses natural pressure at each distant villa. The regulator automatically corrects this drop and ensures gas reaches the villa at safe pressure.
