Copper or steel pipe run
Correct diameter pipe sized to kitchen appliance load and inlet pressure.

Hawalli
A kitchen gas line in Bidaa begins at the external meter and ends at the last branch inside the kitchen. We test every threaded fitting with approved ferrules and confirm the pipe does not touch any wiring or drainage. Handover requires a comprehensive final pressure check covering every metre of line.
Bidaa residential houses sit near the coast close to Salmiya, and many were built with deep foundations and strong concrete walls. We typically run the pipe underground in protected metal conduits coated with moisture barriers. At the kitchen entrance we fit a metal sleeve to protect the pipe from moisture, heat and vibration.
Bidaa is in Hawalli governorate, a residential area close to Salmiya seafront where the climate is constantly humid.
We test the line at 1.5 times working pressure for thirty minutes before releasing it to normal operating pressure.
Correct diameter pipe sized to kitchen appliance load and inlet pressure.
Individual outlet with isolation valve for each hob, oven or fryer.
Pipe run inside protective conduit or channel with ventilation clearance observed.
Joints finished by brazing or press-fit method suited to the pipe material.
Nitrogen pumped to test pressure and held to confirm every joint is tight.
Inspection of an existing run and repair of any corroded section or weeping joint.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use copper coated with a thick epoxy layer or double-coated galvanized steel. The first coat is applied at manufacture and the second on-site after installation.
At least once in summer when heat and humidity are highest. We measure pressure and check joints with soap for any leaks.
