Central gas first-fix
Main gas network laid and pressure-tested before walls are plastered.

Hawalli
Central gas installation in Ministries Area begins with a complete layout of pipe runs from the meter inlet to every appliance point. We run copper or galvanized steel through sealed wall chases, test every joint under high pressure and check thread seals before handover.
Government buildings in Ministries Area are multi-storey and need a gas network delivering even pressure on every floor. We fit a main pressure regulator at the inlet and run vertical risers through shared electrical shafts where space allows. On each floor we place a manual gas isolator close to the cooker or heater for fast supply cutoff during service work.
Ministries Area lies in Hawalli governorate near the Kuwait Government Ministries Complex, where most buildings are government offices, commercial premises and public service centres.
Every threaded joint is tested with soapy water to detect gas leaks before final seal installation.
Main gas network laid and pressure-tested before walls are plastered.
Residential kitchen gas points run to correct sizing and outlet count.
Commercial kitchen gas networks sized for high demand with isolation at each appliance.
Leak located with detection instruments before any wall or floor is opened.
Ball valves fitted at the main inlet and at every branch point.
Periodic check of all valves, joints and fittings across the gas network.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we agree routes with the building on documented paths in an architectural drawing. We run the pipe in an insulating sleeve and leave inspection ports at each direction change.
Right after the final joint is made, we fill the network with dry nitrogen and raise pressure gradually to twice operating pressure for one hour. If pressure holds steady with no drop, the network is safe for use.