Central gas first-fix
Main gas network laid and pressure-tested before walls are plastered.

Hawalli
Central gas installation in Nuqra starts by checking available pressure from the street supply point, then plotting the shortest pipe route from the external meter to the kitchen and bathroom. We test every bend and every joint under elevated pressure and record results on the final certificate before releasing gas to the user.
Flats and small villas in Nuqra near Salmiya have tight spaces between walls and concrete floors. We use small-diameter copper pipes because appliance count is limited and route them through narrow passages under ceiling or inside load-bearing walls. The distance from the external meter to the consumption point is usually short, so intermediate pressure regulators are not needed.
Nuqra lies in Hawalli governorate near Salmiya area and is a residential zone known for modern flats and medium-sized villas.
Before final testing, every threaded joint is hand-checked to ensure tight enough fastening without over-tightening.
Main gas network laid and pressure-tested before walls are plastered.
Residential kitchen gas points run to correct sizing and outlet count.
Commercial kitchen gas networks sized for high demand with isolation at each appliance.
Leak located with detection instruments before any wall or floor is opened.
Ball valves fitted at the main inlet and at every branch point.
Periodic check of all valves, joints and fittings across the gas network.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The test itself takes one hour under doubled pressure. Setup, filling and safe venting add another hour, so total time from start to handover is about two hours.
Copper bends easily by hand and does not corrode, but costs more. Galvanized steel is durable and cheaper but needs special tools for bending and threading. We choose based on your budget and distances.
