Main pipe run
Running the supply line into the kitchen at the correct pipe diameter

Farwaniya
Installing your restaurant gas network in Ardhiya involves routing pipe from the external meter through kitchen walls to each appliance. We select copper or steel pipe based on location and distance, secure it precisely and perform complete pressure testing. Certification and technical drawings are provided upon completion.
Restaurants in Ardhiya near the industrial zone are often larger and need high gas power for heavy grills and industrial ovens. The gas inlet is usually on an external wall far from the kitchen, requiring larger-diameter pipe to reduce pressure loss over long distances. We cut horizontal channels through concrete walls and bury pipe under wall patches, or run it on interior walls in custom-made metal ducting.
Ardhiya in Farwaniya governorate sits near the industrial zone, a commercial district specializing in large restaurants and commercial premises.
Steel pipe in industrial applications is held at constant pressure for 15 minutes before introduction of live gas.
Running the supply line into the kitchen at the correct pipe diameter
Dedicated branch for each burner, oven, grill or fryer in the kitchen
Valve at each appliance so one unit can be isolated without stopping the whole line
Pipes run inside the wall or surface-mounted to suit the building structure
Completed network tested under dry nitrogen pressure before any appliance is connected
Inspecting or extending a working kitchen gas network with minimal downtime
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use larger-diameter pipe and minimize bends in the route. If required pressure exceeds main line capacity, we install a secondary regulator after the main meter.
We use galvanized steel instead of copper in wet areas because galvanizing resists moisture better. All exposed joints are sealed with water-resistant tape.
