Main pipe run
Running the supply line into the kitchen at the correct pipe diameter

Capital
Restaurant gas line installation in Jaber Al-Ahmad City starts by reading kitchen drawings before appliances reach the site. We run pipes from the building meter through empty walls and set connection points at each run until appliances arrive.
New restaurants in Jaber Al-Ahmad City are modern buildings with solid structure and walls that divide easily, which lets us run clean straight pipe inside walls before finishing. We lay tubes in dedicated chases with plastic guard and marker plates, and each connection point gets a number on the drawing so the electrical crew and contractor know where the appliance will mount later. After appliances are set we test each connection alone before final sealing.
Jaber Al-Ahmad City sits in Kuwait governorate, a new residential project where buildings are still under construction and handover.
All wall pipes in new builds come with a pressure certificate from the shop before appliance mounting because retesting after sealing is hard.
Running the supply line into the kitchen at the correct pipe diameter
Dedicated branch for each burner, oven, grill or fryer in the kitchen
Valve at each appliance so one unit can be isolated without stopping the whole line
Pipes run inside the wall or surface-mounted to suit the building structure
Completed network tested under dry nitrogen pressure before any appliance is connected
Inspecting or extending a working kitchen gas network with minimal downtime
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The best time is right after walls go up and before electrical and water lines, so nothing tangles. In Jaber Al-Ahmad we coordinate with the site to delay gas pipes until just after wall drying.
Yes, as long as pipe ends are sealed with metal caps and no one opens the main valve. Before opening we put protective caps on every connection point.
