Main pipe run
Running the supply line into the kitchen at the correct pipe diameter

Jahra
A restaurant gas network in Subbiya typically needs short runs because eateries here are spread far apart. We plan routes from the main inlet along exterior walls to avoid older building interiors. We test pressure and flow, then sign off inspection forms before the ovens are first lit.
Subbiya sits near Sheikh Jaber Bridge and holds a modest number of small and medium shopfronts in older buildings. These structures rarely have pre-existing gas lines, so we install from scratch starting at the inlet regulator. We choose the shortest practical route along the exterior wall or roof to reduce construction cost, and watch carefully not to cut any existing electrical wiring or water pipes.
Subbiya sits in Jahra governorate near Sheikh Jaber Bridge, which connects Kuwait and Saudi Arabia.
We draw a gas sample from the network's farthest point to test purity before use because air may be trapped in new pipes.
Running the supply line into the kitchen at the correct pipe diameter
Dedicated branch for each burner, oven, grill or fryer in the kitchen
Valve at each appliance so one unit can be isolated without stopping the whole line
Pipes run inside the wall or surface-mounted to suit the building structure
Completed network tested under dry nitrogen pressure before any appliance is connected
Inspecting or extending a working kitchen gas network with minimal downtime
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we keep at least five centimetres between them to prevent interference. If both run in a shared metal wall channel, we insulate the gas pipes with foam padding.
We fix robust thick copper pipes to the exterior wall surface rather than trying to hide them inside thin walls. We cover them in a perforated metal duct for sun and moisture protection and paint it to match the facade.
