Central gas first-fix
Main gas network laid and pressure-tested before walls are plastered.

Capital
Central gas line installation in Shuwaikh starts by running the main feed from the external meter up to the roof or ground-floor plant room of the home or shop. We lay copper pipes through walls and ceilings, fit pressure regulators and test every joint using a dedicated pressure gauge.
Shuwaikh has warehouses and retail units alongside residential flats, and many need central gas for backup generators or small food businesses. The gas network here needs short supply runs from the main meter usually sited in the yard near Shuwaikh Co-op. Building roofs are relatively low, so we mount expansion tanks and regulators on secure metal stands instead of random hanging.
Shuwaikh sits in Kuwait governorate next to Shuwaikh Port and the Science Museum, a mixed zone of warehouses, homes and retail units.
Every central gas system is tested by pumping nitrogen and holding pressure for 15 minutes before connecting the actual gas source.
Main gas network laid and pressure-tested before walls are plastered.
Residential kitchen gas points run to correct sizing and outlet count.
Commercial kitchen gas networks sized for high demand with isolation at each appliance.
Leak located with detection instruments before any wall or floor is opened.
Ball valves fitted at the main inlet and at every branch point.
Periodic check of all valves, joints and fittings across the gas network.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The meter is mounted on the shop exterior wall or in the shared yard depending on the building layout. We position it safely away from entrances and run pipes from it inside shop walls or above drop ceilings.
Gas pipe and electrical wiring must be kept at least 30 cm apart. Where they must cross, we use metal protective sleeves around the gas line to prevent direct contact.